Utility · Luoyang (Henan)

20 MWh BESS

Grid-connected large-scale energy storage. 20 MWh and 10 MW in Luoyang (Henan).

Energy
20MWh
Power
10 MW
Duration
2 h
I want a system like thisAll projects

Illustrative image

Datasheet

System data

20 MWh BESS specifications
ParameterValue
Energy20 MWh
Power10 MW
Duration at full power2 h
TypeUtility
LocationLuoyang (Henan) · Henan, China
Equipment

For confidentiality reasons we do not publish the client's name. Some installations can be visited: ask us.

What the system does

Grid-connected large-scale energy storage

A utility-scale BESS buys energy when there is a surplus and returns it when the grid needs it. Several containers operate as a single power plant, coordinated by the EMS and by a power plant controller (PPC) that follows the system operator's setpoints.

  • 01

    Price arbitrage: charges in cheap hours and discharges in expensive ones.

  • 02

    Balancing services and frequency regulation where the market allows.

  • 03

    Power control at the point of connection and real-time telemetry.

  • 04

    24/7 monitoring of cells, power conversion and HVAC from the control centre.

Typical functions of this type of system. The specific strategy for each installation is defined by the preliminary study and fine-tuned by the EMS during operation.

Have an energy storage project?

Tell us what you need and our engineering team will propose the system, the budget and the delivery plan.