Voltage dip
ms – sVoltage drops without reaching zero. Electronic equipment interprets it as a fault and disconnects.
AffectsDrives, PLC power supplies, contactors
Uninterrupted backup (STS)
Drives, PLCs, servers and furnaces won't wait for the generator to start. With a BK battery and static switching, the critical load switches to battery within milliseconds and never notices the outage.
The problem
Most stoppages aren't caused by a long blackout, but by disturbances lasting tenths of a second that nobody sees and that bring the line down.
Supply interrupted for hours across Spain and Portugal.
Enough to protect against a long outage; too late for a continuous process.
How a BK BESS solves it
The static transfer switch (STS) monitors the grid continuously. When it detects an outage or a dip, it isolates the site and the BK battery, with its inverter forming the grid, picks up the load within milliseconds.
The grid supplies the loads and the battery stays charged. Meanwhile, it can shave peaks or shift consumption to cheap hours.
The STS detects the outage or dip and isolates the site from the grid within milliseconds. Static switching, no moving parts.
The bidirectional inverter forms the grid: it sets voltage and frequency and supplies the critical load from the battery.
When the grid is stable again, BK EMS resynchronises and the load returns to the grid. If the outage drags on, the generator starts and the battery bridges the gap.
Illustrative diagram; time scale not to proportion. The generator needs seconds to start and pick up load; static switching does it in milliseconds.
Dip, micro-outage, outage
Voltage drops without reaching zero. Electronic equipment interprets it as a fault and disconnects.
AffectsDrives, PLC power supplies, contactors
Voltage disappears for tenths of a second. The lights barely flicker; the production line stops.
AffectsContinuous processes, servers, refrigeration
No supply for minutes or hours. Without back-up, everything stops until the grid returns.
AffectsEverything without back-up
With BESS + STS, all three are solved the same way: the critical load switches to battery within milliseconds and returns to the grid once the grid is stable.
Comparison
| Criterion | Conventional UPS | Generator | BK BESS + STS |
|---|---|---|---|
| Response time | Immediate (online) | ~10 s: start-up and load pick-up | Milliseconds |
| Autonomy | Minutes | Hours, depending on fuel | From minutes to hours depending on kWh; unlimited with a generator |
| What it covers | IT and control | The whole plant | The critical loads you choose, from 100 kWh to several MWh |
| Use for the rest of the year | None | None | Peak shaving, arbitrage and self-consumption |
| Operation | Batteries requiring periodic replacement | Fuel, start-up tests, noise and emissions | LFP, 24/7 monitoring with BK EMS |
Indicative comparison. The three systems can be combined: a battery with STS doesn't mean removing the generator or the UPS.
Where it matters
Full availability without relying on generators alone. Long-duration LFP back-up with 24/7 remote management.
Extrusion, injection moulding, furnaces, chemicals or food: wherever a few seconds' stoppage costs hours of production.
Irrigation communities and pumping stations that can't afford to stop halfway through the season.
Voltage support during dips and disturbances, and help complying with PO 12.3 in generation facilities.
Recommended products
Bidirectional inverters, island mode and static switching to transfer the load to battery without interruption.
View productOutdoor all-in-one. The BK112H switches to island operation in under 20 ms.
View productModular cabinets to size the exact autonomy your critical loads need.
View productLarge-scale back-up for industrial plants and data centres.
View productReferences
BESS for an irrigation community
Jaén
522kWh
250 kW · STS
Your installation
We tell you which system you need and how it performs in your case.
We also work on large-scale energy storage projects as back-up for major industrial groups in Spain.
Frequently asked questions