Powerbolt · 20 ft container
Up to 6.25 MWh in a 20 ft container.
DC block with liquid-cooled racks, BMS, HVAC and fire suppression built in. Plug & play with minimal civil works, ready for transport and connection to the PCS: the unit we use to build multi-MWh plants.
6,058 × 2,438 × 2,896 mm · 20 ft
- 5.015MWh
- Energy per container
- 95%
- DC round-trip efficiency
- 1,123–1,498Vdc
- DC block voltage
- ≤ 46t
- Weight
@ 0.5C · also 3.34 and 6.25 MWh
96% @ 0.25P
12 racks 1P416S
20HC · 6,058 × 2,438 × 2,896 mm
Inside
4,992 cells, twelve racks, one block.
In the 5.015 MWh Powerbolt, each rack strings 416 LFP cells of 314 Ah up to 1,331 V nominal. Twelve racks in parallel add up to 5.015 MWh with 95% DC efficiency at 0.5P.



- Configuration
- 1P416S × 12
- Current per rack
- 157 A discharge · 193 A charge (5 min)
- Associated PCS
- 6 × 417 kW or 2 × 1.25 MW
- Communication
- CAN · Ethernet
BK integration
From DC block to operating plant
The container is the energy block. Around it we integrate power conversion, medium voltage, plant control and operation. A single party accountable for the plant meeting the grid operator's requirements.
- Integrated
- In the project
- Optional
- 01Integrated
314 Ah LFP cells
4,992 cells in 12 racks of 416 in series (5.015 MWh). 8,000 cycles to 70% state of health (0.5P, 25 ± 2 °C). The 6.25 MWh model uses 587 Ah cells.
- 02Integrated
Rack-level and system BMS
Monitoring of every cell, balancing and protection of every rack. Class B functional safety.
- 03Integrated
Liquid cooling and HVAC
Liquid circuit per pack with ΔT ≤ 2 °C, thermal and acoustic insulation and self-contained container HVAC.
- 04Integrated
Detection and suppression
Aerosol fire suppression built into the container (3.34 and 5.015 MWh); three-level protection, pack, cluster and container, on the 6.25 MWh model.
- 05In the project
PCS and transformer station
Six 417 kW PCS or two 1.25 MW PCS per container, plus whatever medium-voltage transformer the point of connection requires.
- 06In the project
BK EMS, PPC and SCADA
EMS Max for utility scale: forecasting, arbitrage, balancing services and system operator setpoints. PPC for power control at the point of connection.
- 07Integrated
Plant communications
CAN and Ethernet in the block to the plant controller. IEC 61850 and Modbus at EMS level.
Models and datasheet
Three models, one 20 ft container.
3.34 MWh for smaller points of connection, 5.015 MWh as the standard block and 6.25 MWh with a 587 Ah cell for maximum density. Data from the 2026 catalogue datasheet.
Liquid coolingPowerbolt 3.34 MWh
Published datasheet- 3.34MWh
- Rated energy
- 1,672kW
- Power (0.5P)
- ≤ 35t
- Weight
The lowest-energy configuration in 20 ft, for smaller points of connection. Aerosol fire suppression and C4 anti-corrosion.
- GB/T 36276
- UN 38.3
Liquid coolingPowerbolt 5.015 MWh
Published datasheet- 5.015MWh
- Energy @ 0.5C
- 95%
- DC RTE @ 0.5P
- 12racks
- 1P416S · 314 Ah
- GB/T 36276
- IEC 62619
- IEC 63056
- IEC 62477
- IEC 61000
- IEC 62933-5-2
- UN 38.3
Liquid coolingPowerbolt 6.25 MWh
Published datasheet- 6.25MWh
- Rated energy
- 587Ah
- LFP cell
- 8racks
- 1P416S
Maximum density in 20 ft with a 587 Ah cell. Three-level fire protection (pack, cluster and container) and C5 anti-corrosion. Power and other data on request.
Full datasheet · Powerbolt
Scroll the table sideways if you can't see every model
| Parameter | Powerbolt 3.34 MWh | Powerbolt 5.015 MWh | Powerbolt 6.25 MWh |
|---|---|---|---|
| System | |||
| Rated energy | 3,343.97 kWh | 5.015 MWh @ 0.5C | 6,251 kWh |
| Power (0.5P) / associated PCS | 1,672 kW | 2,500 kW (PCS: 6 × 417 kW or 2 × 1.25 MW) | On request |
| DC voltage | 1,123.2–1,497.6 V | 1,123.2–1,497.6 V | 1,331.2 V rated |
| DC efficiency (RTE) | — | 96% @ 0.25P · 95% @ 0.5P | On request |
| Battery | |||
| Cell | LFP 3.2 V · 314 Ah | LFP 3.2 V · 314 Ah | LFP 587 Ah |
| Configuration | — | 1P416S × 12 racks | 1P416S × 8 racks |
| Max. discharge / charge current | — | 157 A × 12 / 193 A × 12 (5 min) | On request |
| Service life | 8,000 cycles (0.5P, 25 ± 2 °C, 70% SOH) | 8,000 cycles (0.5P, 25 ± 2 °C, 70% SOH) | On request |
| Environment | |||
| Operating temperature | −20…50 °C | −20…50 °C | On request |
| Ingress protection rating | IP55 | IP55 (IP67 pack) | IP54 (customisable) |
| Anti-corrosion | C4 | C4 | C5 |
| Cooling | Liquid | Liquid | Liquid |
| Control | |||
| Fire suppression | Aerosol | Aerosol | Three levels: pack, cluster and container |
| Communication | CAN · Ethernet | CAN · Ethernet | On request |
| Functional safety | — | Class B | — |
| Mechanical | |||
| Dimensions (W × D × H) | 6,058 × 2,438 × 2,896 mm | 6,058 × 2,438 × 2,896 mm (20HC) | 6,058 × 2,438 × 2,896 mm |
| Weight | ≤ 35 t | ≤ 46 t | ≈ 50 t |
20 ft liquid-cooled container (catalogue, p. 18). Certifications: 3.34 MWh GB/T 36276 and UN 38.3; 5.015 MWh GB/T 36276, IEC 62619, IEC 63056, IEC 62477, IEC 61000, IEC 62933-5-2 and UN 38.3; 6.25 MWh on request. Indicative parameters, subject to final design.
Indicative sizing
How many Powerbolts does your plant need?
Move the target energy. We calculate with 5.015 MWh containers at 0.5C; the actual design depends on the point of connection, the duration and the expected degradation.
- 4
- 5.015 MWh containers
- 10 MW
- Power at 0.5C (2 h)
- 59 m²
- Container footprint (excluding aisles)
- 24
- 417 kW PCS (or 8 × 1.25 MW)
Simplified calculation without degradation margins or auxiliary services. Our largest system delivered: 188 MWh in Lianyungang (China).
Applications
Built for MWh-scale plants
The Powerbolt is the building block when energy is measured in megawatt hours.
Utility-scale energy storage
Standalone BESS for arbitrage, balancing services and capacity markets.
PV + BESS hybridisation
Alongside an existing solar PV plant: charges with midday curtailed energy and sells in the evening, without losing the regulated remuneration (RD 917/2025).
Off-grid systems
Plug & play delivery with little civil work: designed for remote sites and fast deployment.
Safety and certifications
Contain any incident within the container.
Integrated fire suppression, sealed packs and self-contained HVAC. Every level of the system has its own barrier.
- 01
Layered protection
IP55 container with IP67 packs (5.015 MWh); customisable IP54 on the 6.25 MWh model. C4 or C5 anti-corrosion.
- 02
Aerosol fire suppression
Integrated aerosol fire suppression; on the 6.25 MWh model, three-level protection: pack, cluster and container.
- 03
Climate-controlled
Thermal and acoustic insulation and self-contained HVAC: the cells stay within their temperature window all year round.
- 04
Functional safety
Class B on the 5.015 MWh Powerbolt, with centralised control. Operation from −20 to 50 °C.

Standards declared in the datasheet
GB/T 36276
Lithium batteries for energy storage (China)
IEC 62619
Industrial lithium battery safety
IEC 63056
Safety of lithium batteries for energy storage
IEC 62477
Safety of power converters
IEC 61000
Electromagnetic compatibility
IEC 62933-5-2
Safety of electrochemical energy storage systems
UN 38.3
Transport of lithium batteries
Certifications for the 5.015 MWh Powerbolt as stated in the datasheet (catalogue, p. 18). The 3.34 MWh model declares GB/T 36276 and UN 38.3; those for the 6.25 MWh model are available on request.
Multi-MWh project?
We help you with sizing, grid access and connection, engineering and operation. From feasibility study to plant in operation.