Platform · Techno-economic study

Techno-economic energy storage study for your business.

Using your bills or load curve, our engineers size the battery your supply point needs and calculate its return with the 2026 regulated tariffs.

What you get

Hours analysed
8,760
Tariff periods
P1–P6
Tariffs
2026
Deliverable
PDF

For industrial, commercial, agricultural and service supply points, with or without solar PV.

What's included

What a committee needs to decide.

Not a sales estimate: a simulation of your supply point, hour by hour, with the real equipment and tariffs.

01

Consumption X-ray

All 8,760 hours of your supply point's year: profile by period P1–P6, power peaks, PV surplus and excess-power penalties paid.

02

BESS sizing

The power and capacity that maximise return, with the equipment from the BK range that fits your site.

03

Simulation with 2026 tariffs

Hour-by-hour operation with the current regulated grid access charges and levies and your energy contract, fixed or indexed.

04

Scenarios compared

Battery only, PV + battery and different sizes, side by side to see what each decision adds.

05

NPV, IRR and payback

CAPEX, a breakdown of annual savings, and cash flows over the system's service life.

06

PDF report

A techno-economic document for management, financing or the investment committee.

How it works

Three steps, one point of contact.

  1. 01

    You send the data

    Bills or load curve, plus four company details. Five minutes.

  2. 02

    Engineering analyses

    We review the supply point, simulate the scenarios and validate the technical fit.

  3. 03

    We review it with you

    We present the report, answer your questions and, if you go ahead, prepare the quote.

Request

Start with the data you already have.

If you don't have the load curve, your bills are enough. If you have nothing to hand, fill in the company and contact details and we'll tell you how to get it.

  • Your files are only used for the study.
  • Carried out by our engineering team, not a salesperson.
  • No purchase commitment.
01 · Consumption data

Electricity bills for the last 12 months in PDF, or the hourly or quarter-hourly load curve in CSV or XLSX (downloadable from your distribution company or Datadis). With the load curve, the study is more accurate.

    02 · Company and supply point
    What you want to achieve
    03 · Contact

    Required fields

    Prefer to talk it through first?

    Tell us about your case and we'll tell you what data we need and what you can expect from a battery at your supply point.