STS backup · Jaén

BESS with STS for an irrigation community

Battery with static transfer switch. 522 kWh and 250 kW in Jaén.

Energy
522kWh
Power
250 kW
Duration
2.1 h
I want a system like thisAll projects

Illustrative image

Datasheet

System data

BESS with STS for an irrigation community specifications
ParameterValue
Energy522 kWh
Power250 kW
Duration at full power2.1 h
TypeSTS backup
LocationJaén · Andalusia, Spain
DetailsStatic transfer switch (STS)
Equipment

For confidentiality reasons we do not publish the client's name. Some installations can be visited: ask us.

What the system does

Battery with static transfer switch

With a static transfer switch (STS), the battery picks up the load within milliseconds if the grid fails, without the equipment even noticing. The rest of the time it keeps working: it stores cheap or solar energy and uses it during expensive hours.

  • 01

    Switchover in milliseconds during outages and micro-outages.

  • 02

    Continuity for pumping and critical processes.

  • 03

    Arbitrage and self-consumption while the grid is available.

  • 04

    24/7 alarms and remote monitoring.

Typical functions of this type of system. The specific strategy for each installation is defined by the preliminary study and fine-tuned by the EMS during operation.

Have an energy storage project?

Tell us what you need and our engineering team will propose the system, the budget and the delivery plan.